PHASE 7 VISION — CONTROL PLANE & OPERATOR INTERACTION¶
Project: AeroDB Phase: Phase 7 — Control Plane, Admin UI, and Operator Tooling Status: AUTHORITATIVE · PRE-IMPLEMENTATION
1. Purpose of Phase 7¶
Phase 7 introduces explicit human-operated control surfaces for AeroDB.
The purpose of Phase 7 is not to make AeroDB smarter, faster, or more autonomous. The purpose is to make AeroDB:
- Operable by humans
- Observable in complex failure scenarios
- Auditable after incidents
- Controllable only through explicit, deliberate action
Phase 7 exists to give operators visibility and authority, not to give the system decision-making power.
Phase 7 is a control plane, not a brain.
2. Foundational Principle¶
AeroDB is correctness-first infrastructure software.
All correctness, safety, durability, and determinism guarantees are fully defined and enforced by Phases 0–6.
Phase 7:
- MUST NOT weaken those guarantees
- MUST NOT reinterpret them
- MUST NOT add alternative execution paths
Phase 7 is strictly downstream of the correctness kernel.
If Phase 7 is removed entirely, AeroDB must remain correct, deterministic, and crash-safe.
3. Explicit Non-Goals (Critical)¶
Phase 7 MUST NOT:
-
Automate decisions
-
No automatic failover
- No automatic promotion
-
No automatic remediation
-
Introduce heuristics
-
No thresholds that trigger actions
- No background evaluators
-
No “recommended actions” executed implicitly
-
Create control loops
-
No polling → decision → action cycles
-
No retry loops that change state
-
Act without human intent
-
No implicit retries
- No hidden confirmations
-
No background mutations
-
Override invariants
-
No bypassing durability
- No bypassing single-writer rules
-
No bypassing fail-closed behavior
-
Hide consequences
-
No silent partial success
- No best-effort execution
- No “eventual” control-plane effects
Any of the above would violate AeroDB’s philosophy and are forbidden.
4. Human-in-the-Loop Model¶
Phase 7 is explicitly designed around a human-in-the-loop execution model.
This means:
- Every mutating action requires an explicit operator request
- Every request must be explainable before execution
- Every action must be confirmable by the operator
- Every outcome must be observable and auditable
The system does nothing unless a human asks it to.
5. Authority Separation¶
Phase 7 introduces no new authority over data correctness.
Authority boundaries:
- Data plane authority: Phases 0–6
- Control plane authority: Phase 7
The control plane:
- May request actions
- May observe system state
- May surface explanations
The control plane:
- May NOT decide correctness
- May NOT infer safety
- May NOT repair inconsistencies
If the control plane requests an invalid action, the request MUST be rejected explicitly.
6. Determinism Guarantee¶
All Phase 7 behavior MUST be deterministic.
Given identical:
- System state
- Operator input
- Configuration
Phase 7 MUST:
- Present identical information
- Produce identical explanations
- Accept or reject actions identically
No Phase 7 behavior may depend on:
- Timing
- Ordering of UI events
- Retry timing
- UI refresh behavior
7. Failure Philosophy¶
Phase 7 MUST fail closed and loudly.
Failure rules:
- If an action cannot be proven safe → it is rejected
- If system state is ambiguous → no action is taken
- If the control plane crashes → no partial action occurs
The control plane MUST NEVER attempt:
- Partial execution
- Roll-forward repair
- Automatic retry
Operator re-issuance is the only recovery mechanism.
8. Idempotence and Replay¶
Phase 7 actions are not implicitly idempotent.
An operator action:
- Is either executed exactly once
- Or not executed at all
If a client retries a request:
- The system must detect duplicates
- Or explicitly reject the retry
Silent re-execution is forbidden.
9. Observability as a First-Class Requirement¶
Phase 7 is the primary interface through which humans understand AeroDB.
Therefore:
- All state transitions must be observable
- All decisions must have explanations
- All rejections must reference violated invariants
- All actions must leave an audit trail
Observability is passive.
It must never influence control flow.
10. Auditability and Accountability¶
Phase 7 MUST make post-incident analysis possible.
This includes:
- Who requested an action
- When it was requested
- What state existed at the time
- Why the action was accepted or rejected
- What invariants were relied upon
If a past action cannot be reconstructed, Phase 7 has failed its purpose.
11. Security Boundary (Conceptual)¶
Phase 7 defines security boundaries, even if enforcement is deferred.
This includes:
- What actions are considered privileged
- What information is considered sensitive
- What boundaries exist between observers and actors
Actual authentication and authorization mechanisms may be implemented in later phases, but boundaries must be explicit now.
12. Compatibility with Future Phases¶
Phase 7 MUST NOT pre-commit AeroDB to:
- Any specific UI framework
- Any specific deployment model
- Any specific auth system
- Any cloud-provider assumptions
Phase 7 defines behavioral contracts, not implementation choices.
13. Freeze Criteria¶
Phase 7 may be frozen only when:
- All operator actions are explicitly specified
- All failure modes are documented
- No automation exists
- All actions are explainable
- All invariants are preserved
- Auditability is demonstrably complete
14. Final Statement¶
Phase 7 exists to make AeroDB usable by humans without making it dangerous.
It is intentionally conservative.
It prefers:
- Rejection over ambiguity
- Explicit failure over silent action
- Human responsibility over system autonomy
If Phase 7 ever makes a decision on behalf of an operator, it is wrong.
This vision is non-negotiable.
END OF PHASE 7 VISION